Project Location |
: |
Ambattur |
Type of Project |
: |
Industrial |
Plinth Area |
: |
12200 Sft |
Status |
: |
Completed |
|
Excavation |
: |
Earthwork excavation in all types of soil for Column, footings, plinth beam etc |
Filling (sand) |
: |
Supplying and filling coarse sand in foundations and basement etc |
PCC |
: |
Providing and laying and compacting plain cement concrete in foundations and basement(1:4:8) |
Water Proofing with plaster |
: |
Prepare the surfaces and plastering all four sides of columns with water proof compound |
Gravel Filling |
: |
Supplying and filling gravel in layers of 200 mm thick , watering and consolidation etc |
Shuttering |
: |
Providing and fixing shuttering (Formwork) with necessary Centering, Bracings, Propping etc and removing the same after the specified periods |
Raft Concrete |
: |
Supplying and laying R.C.C M20 Grade for footings , Mat concrete, columns and plinth beam etc |
GSB |
: |
Providing and laying GSB wet mix in mezzanine floor (75 mm thickness) |
Masonry |
: |
Brick work for basement & Brick work for super structures |
Compound wall |
: |
Demolition of Compound wall Excisting pillars and beams |
Sump |
: |
12000 Ltrs sump R.C.C with waterproofing |
Septic Tank |
: |
12000 Ltrs septic tank |
Culvert |
: |
Front culvert 10'' depth |
Bore |
: |
Providing New Bore at NE corner with motor |