SIGNET MANOR

Project Location

:

Gopalapuram , Dhamodharan Street

No of Dwelling Units:

:

7

Plinth Area

:

12300 Sft

Year Of Commencement

:

1996

Year of Completion

:

1997

#

Foundation

:

RCC Columns with isolated footing connected at various grids as per structural drawing.

Structure 

:

 R.C.C. Framed structure with R.C.C. Columns, Beams and Slabs.

Roof slab 5” thick, lintel 6” thick, sunshade 2” thick.        

Structural Design adhering to Code/Norms.

Basement

:

Basement of 9” thick solid blocks in C.M 1:5 Mix above plinth beam to a depth of 1’6” for car parking and 3’0” for flat from Road level.

Super Structure

:

230mm thick brick wall in CM 1:6 mix using stock bricks to height of 9’6” from the floor to roof slab bottom level.

Partition wall

:

115mm thick in CM 1:5 using stock bricks to height of 9’6” from the floor level

Plastering

:

Ceiling plastering in CM.1:3 mix wall plastering in C.M 1:5 with sponge finishing.

Wood Work

:

Main door : Main door  with good quality of teak wood panelled door with lock, Brass handle, Brass 5” hinges.

Other doors : Other doors with Malaysian country wood (Kongu or IIndquality teak) frames using water proof flush shutters and doors with 35mm thick with required fixtures & fittings. Toilet door with PVC coating.

Windows : Windows with Malaysian country (Kongu or IInd quantity teak) wood frame with Glazed shutter and necessary fixtures & fittings and grill work.

Ventilator : Ventilator with glazed shutter with grill work and require fittings and fixtures.

Flooring

:

2’X2’ vitrified tiles including skirting.(Johnson , Somany, Marbito, KAG)

Toilet

:

Toilet walls 7’ height glazed tiles Dado antiskid flooring.

Kitchen

:

Loft, Cuddapah cupboard and kitchen top finished with granite slab and Stainless Steel Sink, side walls finished with 2’0” height ceramic tiles.Kitchen Top (30 SFT)-wall glading – 60sft

Bedroom

:

Loft will be provided one side with Cuddapah shelf.

Electrical work

:

Wiring work with necessary controlling apparatus using ISI cables and provision for Antenna telephone cables. Plated Switches.

Sanitary work

:

Required sanitary pipe line arrangements.

Painting work

:

Main door finished with Varnish.

Door and windows finished with enamel paint.

Interior wall finished with wall putty with two coats of interior emulsion paint over one coat of primer. (Asian paints)

Exterior walls with water proof cement paint with necessary primer coat. (Asian paints)

Sanitary fittings

:

All sanitary with parry ware make (White colour only) and C.P. Fittings metro or Ess Ess make.

Staircase

:

Staircase treads will be provided green Marble Risers will be provided white Marble.  Handrails MS Vertical and horizontal bars over 2” Dia SS Pipes. 

SUMP

: 

One Common Sump for Metro Water storage. 

Over Head Tanks 

 

Two common overhead Tanks for Borewell & Metro Water respectively.

Electrical :

 

Three phase connection with concealed Copper wiring of ISI quality; Modular Switches – provided in white Color.

Lift :

 

One Five passenger lift serving all floors

Car parking

 

Stilt car parking